Exam ID HP2-T28
Exam type Web-Based online exam used in certifications
Exam duration 1 hour 30 minutes
Exam length 55 questions
Passing score 75%
Delivery languages English
Related Certifications
Supporting courses These recommended courses help you prepare for the exam

Register for this Exam

You will need an HP Learner ID and a Pearson VUE login and password.

During the exam, you can make specific comments about the exam and items. HP welcomes these comments as part of our continuous improvement process.

Exam description

This certification exam attests that you have the skills required to: 1) identify, describe, position, demonstrate, and specify the correct solution based on identified customer needs; 2) perform a high-level ROI/TCO analysis and discuss a customer’s current IT infrastructure maturity level based on a provided CI-CM report; 3) explain how the HP BladeSystem solution forms a core element of the Converged Infrastructure and how the HP Virtual Connect reduces complexity, lowers costs, and increases virtualization in modern data centers; and 4) demonstrate a broad understanding of purpose, function, market positioning, competition, and capabilities of data center solutions based on the HP Converged Infrastructure and Converged Cloud.

Who should take this exam?

Although anyone can take this exam, most successful candidates have at least 2 years of real-world experience working with HP servers in enterprise environments and have taken the recommended training. Successful candidates also prepare for the test in a variety of ways. This guide describes some of these ways and provides references to materials for further preparation.

Exam contents

This exam has 55 questions. Here are types of questions to expect:
  • Matching
  • Multiple choice (multiple responses)
  • Multiple choice (single response)
  • Drag-and-drop
  • Other
  • Pull down menu selection

Tips for taking this exam

Rather than emphasize simple memorization, this exam attempts to assess whether you have the knowledge and skills that an IT professional requires on the job. Therefore, many test items present a scenario, which outlines a particular environment or problem. Some test items might also include one or more exhibits.

Take the time to read the entire question and consider all of the options carefully before you answer. If the question indicates that it features an exhibit, study the exhibit and reread the question. Make sure to select the answer that correctly responds to the question that is asked — not simply an answer that includes some correct information. If the question asks for more than one answer, remember to select each correct answer. You will not receive partial credit for a partially correct answer.

Objectives

This exam validates that you can successfully perform the following:
3%

Competitive positioning (recognizing opportunity)


  • Describe the HP server solution marketplace


Identify resources for information about the current HP c-class BladeSystem portfolio

28%

Solution implementation (install, configure, setup)


  • Install/configure server hardware, infrastructure, options


o  List the steps for planning an HP BladeSystem c7000 enclosure installation
o  Explain the process for installing the c7000 enclosure components
o  Define the enclosure numbering scheme
o  Describe the HP BladeSystem c-Class enclosure power and thermal monitoring
o  List the initial steps involved in setting up the c7000 enclosure using the Insight Display Initial Setup Wizard and the HP OA First Time Setup Wizard
o  Explain c-Class enclosure signal pathing for installing mezzanines and interconnects in the correct locations

  • Install/attach HP external storage


o  Explain the placement rules and installation guidelines for storage and expansion blades

  • Install/configure HP management software


Explain how to access the HP Service Pack for ProLiant (SPP) download and documentation

21%

Solution management (administrative and operational tasks)


  • Use HP Server Management


o  Explain how to configure power for an HP BladeSystem c-Class enclosure

  • Manage/maintain firmware and drivers


o  Determine what firmware is embedded in various components in the enclosure and how to update it
o  Describe how to update firmware for the HP Onboard Administrator (OA) using HP Smart Update Manager (HP SUM) and Enclosure Firmware Management (EFM)
o  Explain how to implement HP BladeSystem c-Class enclosure firmware
Explain how to update firmware embedded in the OA for a blade enclosure

48%

HP server products, solutions, and warranty/service offerings


  • Differentiate HP server products, technologies, processes


o  Differentiate the two types of HP BladeSystem enclosures
o  Identify HP BladeSystem ProLiant servers
o  Identify HP Integrity server blades
o  Identify c-Class Integrity servers and their requirements
o  Describe the HP BladeSystem c-Class enclosure
o  Describe the c-Class enclosure structure
o  Identify the distinctions between the ProLiant G7 and Gen8 servers
o  Describe the technologies on the ProLiant system board (Mezzanines, USB and SD cards, Embedded LOM and FlexibleLOM)
o  Describe the VC Flex technology

  • Identify/define HP data center and rack infrastructure solutions


o  Describe the structural cooling components and features
o  Explain how to control power in a c-Class enclosure
o  Describe HP intelligent location and power discovery services

  • Compare/contrast I/O connectivity options


o  Name the BladeSystem c-Class Ethernet interconnect modules (Virtual Connect, switches, pass-thru modules)
o  Name the BladeSystem c-Class Fibre Channel interconnect modules (Virtual Connect, switches, pass-thru modules)
o  Name the BladeSystem c-Class InfiniBand interconnect modules (InfiniBand switches)
o  Name the BladeSystem c-Class SAS interconnect modules
o  Describe other components in the c-Class portfolio (adapters and mezzanines, interconnects, c-Class options)
o  Describe how the HP BladeSystem enclosure architecture enables partnering of server blades with storage or expansion blades
o  Identify ways to use Virtual Connect technology in a data center
o  Describe the BladeSystem c-Class interconnect module architecture
o  Describe the mezzanine cards and slots available in the BladeSystem c-Class server blades
o  Describe HP BladeSystem c7000 and c3000 port mapping

  • Compare/contrast HP storage options


o  Describe the features and components of storage, tape, and expansion blades
o  Describe the VC FlexFabric FC storage with 3PAR solution

  • Identify HP management tools and solutions


o  Explain how to access the HP Onboard Adminstrator
o  Describe the OA management features
o  Define the benefits of HP BladeSystem solutions with Virtual Connect technology
o  Describe Virtual Connect technology and its main components

  • Differentiate HP standard warranties and support options for server solutions


Define the warranty and support options for HP BladeSystem solutions