Course ID 00071751
HP product number U4150S
Course format ILT
Course length 4 days
Skill level Foundational
Delivery languages English
Related certifications
In preparation for these exams
Selected items from this course are included in these exams:
Register for this course.
Find this course in the Training calendar and click the “Register” link in the last column to begin your registration.

Course description

This course introduces the foundation and basic skills necessary to install, configure, and manage new and changed operating and product software on HP NonStop S-series and Integrity NS-series servers. This course is 50 percent lecture and 50 percent hands on labs using HP servers.

Who should attend

• System operators
• System managers
• Personnel responsible for the installation of operating and product software on HP NonStop S-series and Integrity NS-series servers

Prerequisites

• Experience with general software installation procedures
• NonStop S-series Server Administration I (U5448S) and NonStop S-series Server Administration II
(U5449S)
OR
• NonStop NS-series Server Administration I (U8528S) and NonStop NS-series Server Administration II (U8638S) or Equivalent system management experience
• Experience with Pathway, HP NonStop TMF, and HP NonStop SQL are beneficial
For complete prerequisites and requirements to achieve any of the related certifications or upgrade paths, see the certification description on the HP ExpertOne website.

Topics

  • Module 1 - Introduction to DSM/SCM
    • What is Distributed Systems Management/Software Configuration Manager (DSM/SCM)
    • DSM/SCM primary purpose
    • Primary DSM/SCM resources
    • DSM/SCM user interfaces
  • Module 2 - DSM/SCM Process Flow
    • Step 1 – receive software
    • Step 2 – plan the new software revision
    • Step 3 – build
    • Step 4 – apply the new software revision
    • Step 5 – create/review discrepancy report
    • Step 6 – activate the new software revision
  • Module 3 - The Planner Interface (PI)
    • Planner Interface (PI) purpose and activities
    • Lab exercise: Planner Interface simulator
  • Module 4 - The CNFGINFO Tool
    • CNFGINFO tool overview and purpose
    • Activities performed by the CNFGINFO tool
    • Lab exercises: PC setup and the CNFGINFO tool
  • Module 5 - The Archive and Database Maintenance Interfaces (MI)
    • Maintenance Interface (MI) purpose and activities
  • Module 6 - The Target Interface (TI)
    • Target Interface (TI) purpose and activities
  • Module 7 - Activating Updated Target Software
    • How to activate the new software
    • Using and running ZPHIRNM
    • DSM/SCM fabricated names
    • Standard operator instructions
    • How to update EMS templates
  • Module 8 - Installing and Initializing DSM/SCM
    • Define DSM/SCM environment
    • Initial installation and setup of DSM/SCM host and target systems
    • Running INITENV using different options
    • Starting and stopping DSM/SCM
    • Lab exercises: INITENV and Maintenance Interface (MI); ZPHITMI; initialization build/apply
  • Module 9 - DSM/SCM Management Considerations
    • Changing preconfigured DSM/SCM attributes
    • Changing NonStop server name and number
    • OSBUILDER considerations
    • NonStop S-series and NS-series systems DSM/SCM differences
    • Web interfaces on NS-series servers
    • Lab exercises: system report and independent snapshot; true build/apply; ZPHIRNM; backout
  • Module 10 - Helpful Tools and Cloning
    • Using the ZPHIUTL utility
    • Displaying DSM/SCM EMS messages with ZPHIUTL and EMSDIST
    • Using CLEANOSS and SPRCHECK tools
    • Simplifying installation and management of multiple identical NonStop servers
  • Module 11 - DSM/SCM Best Practices and Operational Considerations
    • From “What not to forget” to best practices on how to clean up the DSM/SCM archive
  • Onsite Delivery Equipment Requirements
    • HP NonStop server with DSM/SCM host system with Pathway, TMF, and SQL installed and DSM/SCM host system software capable of supporting target system
    • Planner Interface and CNFGINFO PC installed and connected to the host via Winsock
    • HP NonStop S-series or Integrity NS-series target system that is expand-connected to the host system and can be initialized in lab environment
    • Projecting equipment, computer to display MS PowerPoint slides, and access to a TACL process
    • Student computers with access to a TACL process

Objectives

After completing this course, you should be able to do the following:
  • Install and configure DSM/SCM on both host and target systems, and install and configure the Planner Interface on a PC workstation
  • Use the Planner Interface to perform all activities related to managing software configuration on multiple target systems
  • Use the Target Interface to perform DSM/SCM activities on a target system
  • Use the archive and database Maintenance\ Interfaces to manage and maintain both the archive and databases associated with a host and target environment
  • Use the CNFGINFO tool to build or modify file and product attributes for software managed by DSM/SCM
  • Understand and perform activities required to activate new software on the target system
  • Understand and perform the proper steps required to back out to the previous revision
  • Use the ZPHIUTL diagnostic utility

How to register

View the HP ExpertOne Global Training Calendar to register for the trainings offering that best meets your needs.

Policies, fees and cancellations

Course fees may vary and are established and collected by the training center delivering the course. Cancellation fees may apply. Contact your HP Authorized Training Partner for their respective policies.